Skip to content
469-972-8639
Stamped concrete patio with an outdoor kitchen and umbrella table

Allen · Collin County

Concrete Contractor in Allen, TX

Driveways, patios, walks and slabs for Allen homes on Houston Black clay, with both city permits handled.

  • Free written estimates
  • Install-only crew: we furnish and install, no supply sales
  • 3-step process: design, prep, pour
  • Insured

Free estimate in Allen

Takes about 30 seconds

Prefer to talk? Call 469-972-8639.

The straight answer

A concrete contractor in Allen, TX answers to two city desks: Building and Permitting on Century Parkway for work on your lot, and Engineering's Right-of-Way Division for anything between your property line and the curb. The Colony Concrete Co pulls both permits, pours to Allen's paving details, and gives you a free written estimate first.

Allen at a glance

Allen is a Collin County city on U.S. Highway 75. The Building and Permitting Division at 305 Century Parkway handles lot work, and Engineering's Right-of-Way Division handles curbside work. The city lies entirely in Collin County, while Plano and Frisco cross into Denton County and Carrollton reaches into Dallas County. Lewisville Lake and its Corps flowage easement sit well west of here, so that rule doesn't touch lots in this city. We serve Allen along with Plano, Frisco, Prosper, Hebron and Addison.

Two-thirds of NRCS sample points in the city rate Very limited for slabs, and Houston Black clay at 12 to 17 percent shrink-swell accounts for 18 of those 20. FEMA's map puts 25 of 30 sample points in Zone X minimal flood hazard.

Permit office: City of Allen Building and Permitting Division (Right-of-Way and Utility Division for approaches and public sidewalks) · official page Driveways and sidewalks are not permit-exempt in Allen; right-of-way permits go through Engineering's online form, about 10 business days.

Allen homes are young, and that changes the job list

Allen stands on U.S. Highway 75 in southwestern Collin County, eight miles southwest of McKinney. The town was established in 1870 by a purchasing agent for the Houston and Texas Central Railway, and it was named in 1872 for Ebenezer Allen, a former Texas attorney general. The houses are far newer than the town. Census figures give a median year built of 2003, with 33 percent of units built in 2000 to 2009, 27 percent in 2010 or later, and only 7 percent before 1980 (ACS 2024).

Six in ten homes here went up in 2000 or later. On a house that age, the requests a concrete contractor in Allen hears include a wider driveway or a parking pad beside it, a bigger back patio, a walk to a side gate, a slab for a shed or a hot tub. Some of that stays on your lot and some reaches the street, and that split decides which permit you need. Our Allen driveway page and Allen patio page go deeper on those two jobs.

Freshly poured concrete driveway running up to a single-story house

Building and Permitting or the Right-of-Way Division: which desk handles your job

The Building and Permitting Division, at 305 Century Parkway, permits work on the lot, and every application goes through the city's Citizen Self-Service portal. Unlike the model code, the city's amended code gives driveways and sidewalks no permit exemption, so flatwork here isn't a pour-it-and-forget-it job. The city tells residents who hire a contractor to confirm the contractor has applied for and received a permit before work starts, and to expect inspections. The last page of each permit lists the required ones. Contractors all register with the city for $50 a year. Homeowners doing their own work sign a Homeowner's Affidavit instead.

The public right-of-way belongs to a different office. Engineering's Right-of-Way and Utility Division reviews, inspects and permits that work, and its forms include a Residential Driveway/Sidewalk Construction/Paving Permit. Since March 3, 2026, those applications go in through an online form, and the city asks for 10 business days. Where does the right-of-way start? The city's March 2026 contractor guidelines put it generally 9 1/2 feet from the back of the curb, and tell you to verify that on the plat from the Collin Central Appraisal District. We check your plat before we price an approach, which is part of what a concrete contractor in Allen has to do.

Long new broom-finish concrete slab poured beside a metal building on open land

What It Costs

Our ranges for reinforced concrete here, before we see the site:

JobPer sq ftTypical projectWhat moves the price in Allen
Driveway, 2-car$7 to $12$3,500 to $8,500Approach work in the right-of-way; a 6 in. heavy-duty section adds $1.50 to $3 per sq ft
Driveway widening, 10 by 24 ft (240 sq ft)$7 to $12$1,680 to $2,880Irrigation reroutes and tie-in dowels to the old slab
Patio extension, broom finish$7 to $12$2,000 to $5,000Patio permit, drainage easements and back yard access
Stamped patio$12 to $20$4,000 to $8,000Pattern, color and sealer
Side walk or gate path$8 to $14$1,200 to $2,500Length, sprinkler lines, and a job minimum on short runs
Shed or shop slab$7 to $12$5,500 to $9,000Size (10x12 pads are $1,000 to $1,700), thickness and permit
Retaining wall (per face sq ft)$30 to $50$4,500 to $7,500Height; taller walls are quoted per plan

These are planning ranges. Once we've looked at the plat, the grade and where the right-of-way line sits, each job gets a free written estimate.

What Allen's approach detail calls for

Sheet SD-P41 of the city's standard paving details spells out the residential approach. Minimum driveway width is 10 ft, and the curb return radius is 10 ft, twice the 5 ft typical radius on Frisco's approach detail. The public walk runs 4 to 5 ft wide, crossing about 1 ft inside the right-of-way line, with a 2 percent maximum cross slope and a redwood expansion joint at that line. Slope on the driveway itself is limited to 8 to 10 percent.

A concrete contractor in Allen also builds to the tie-in rules for new concrete meeting old. Rebar laps 30 bar diameters. When the new slab isn't tied to existing steel, No. 6 dowels 2 ft long are drilled in instead. The street is saw cut to the block-out limit unless the approach is poured with the street. Under sheet SD-P08, driveway strength matches the street when the driveway is built with a paving project and otherwise comes from the construction plan, so the plan we submit carries the mix. Rear-entry lots get a separate detail. An alley driveway is 12 ft typical and 20 ft maximum, with a redwood expansion joint and No. 3 smooth dowels 24 inches long at 12 inches on center.

If you're weighing this city against its neighbors, our Plano, Frisco and Prosper pages cover those cities' approach rules.

Stained concrete patio behind a modern house with outdoor seating

City locates in Allen and what nobody marks for you

Digging in the right-of-way starts with a request for city utility locates. The city wants it at least 48 hours ahead, with the ROW permit number and the Texas811 ticket. The statewide 811 call is separate, and it brings out the utilities that own lines under your yard.

Here's the catch for homeowners: the city does not locate private water lines (from the meter to the house), sanitary sewer laterals or irrigation lines. Those are yours, and sprinkler lines can run right where a driveway widening or a new walk goes. Texas811 doesn't help there either: its FAQ says private lines owned by the property owner are not marked for free. Before we dig, we ask you to show us your sprinkler heads and valves, and any concrete contractor in Allen should plan to reroute heads at the edge of a new slab. When the city opens a street for utility work, its restoration details call for at least 6 inches of 3,600 psi concrete in the patch, which shows how the city treats pavement over its lines.

Our permits guide explains the statewide steps.

How Your Job Goes

  1. Consultation and design

    We measure, pull up your plat to find the right-of-way line and any Private Drainage Easement, and walk the sprinkler heads with you.

  2. Planning and preparation

    We file the building permit in Citizen Self-Service, add the right-of-way permit with Engineering when needed, and request 811 and city locates.

  3. Installation and completion

    We form up, set steel and dowels to the city detail, pour, cut joints, and book the inspections listed on the permit.

Houston Black clay under Allen slabs

The city sits on heavy clay, and a concrete contractor in Allen designs for it. In the NRCS data, 18 of 30 random points inside the city are Houston Black clay. Its shrink-swell value (linear extensibility) is 12 percent, and 17 percent on the eroded phase. NRCS's Houston Black series description says that when dry the soil cracks 0.5 to 4 inches wide and 12 inches deep or more, and the cracks stay open 90 to 150 days in most years. Austin silty clay takes another 7 points at 5.1 percent and rates only Somewhat limited. Taken together, 20 of the 30 points rate Very limited for dwellings on concrete slab.

On flatwork, that means steel held up in the slab, a compacted base, joints cut on time, and no roof water left standing at the slab edge. FEMA shows less flood-zone ground here than in lake-side The Colony. FEMA maps put 25 of the 30 points in Zone X, minimal hazard, and 2 in Zone AE or its floodway. Is your lot one of those? The city keeps flood studies, and you can view them at City Hall through the Land Development contact. Our expansive clay guide has the full clay explainer.

Patio, shed and retaining wall fees for a concrete contractor in Allen

The city's June 2025 fee schedule lists the fees backyard jobs run into: arbor, patio or carport $200; retaining wall $150; screening wall $75; foundation repair $75; accessory structure of 120 to 200 sq ft $75; miscellaneous $50. A re-inspection costs $75 the first time, $100 the second and $125 the third, which is reason enough to get the forms, steel and paperwork right at the start.

A shed up to 120 sq ft is exempt, so long as where you put it doesn't break another city rule, such as sitting in a Private Drainage Easement. That easement doesn't show on the ground, which is why we check the plat before we lay out a pad. The residential forms library adds a Drainage and Grading Affidavit and 2026 patio cover plan review guidelines, so a covered patio has a checklist of its own.

Two timing notes. Construction hours run 7 a.m. to 10 p.m., seven days a week. And the City Council approved the 2024 ICC codes on July 28, 2026, effective September 26, 2026, so applications received on or after that date are reviewed under the new codes (adopted codes). Our slabs page covers slab sizing, and Allen foundations covers additions on an engineered slab. A concrete contractor in Allen who knows these fees and dates can give you a firm number early.

Common Questions

Who issues a driveway permit to a concrete contractor in Allen?
It depends on where the concrete goes. For work on your lot, the Building and Permitting Division issues the permit through Citizen Self-Service. The approach and any public sidewalk sit in the right-of-way, and Engineering's Right-of-Way and Utility Division permits those with its Residential Driveway/Sidewalk Construction/Paving Permit. Replace a whole driveway, approach included, and you need both. We file both.
How long does Allen take to approve a right-of-way permit?
The city asks applicants to allow 10 business days for processing, and since March 3, 2026, right-of-way permits go in through an online application instead of on paper. We file once the design is set, so approval and your pour date line up.
Where does my Allen lot end and the right-of-way begin?
The city's March 2026 contractor guidelines put the right-of-way line generally 9 1/2 feet from the back of the curb, and tell you to verify it on the plat from the Collin Central Appraisal District. On the city's approach detail, the public walk sits about 1 ft inside that line.
Do I need a permit for a shed slab in Allen?
Sheds up to 120 sq ft are exempt from a building permit here, provided the placement doesn't break another city rule, such as putting the shed in a Private Drainage Easement. An accessory structure from 120 to 200 sq ft carries a $75 permit on the June 2025 fee schedule.
Will Allen mark my sprinkler lines before you dig?
No. The city locates its own lines when you ask with the ROW permit number and 811 ticket, but it won't locate private water lines from the meter, sanitary sewer laterals or irrigation lines. Point out your valves and heads before we start, and we will plan the slab edges around them.
Which building code applies to my Allen project?
Allen approved the 2024 ICC codes, including the 2024 International Residential Code, on July 28, 2026. They took effect September 26, 2026, and applications received on or after that date go through review under the new codes. If you applied earlier, ask the Building and Permitting Division which edition covers your permit.

Sources

Here's What Our Clients Have To Say

Towns We Pour In Around The Colony

We pour in The Colony and the north DFW towns within about 30 minutes. Don't see your town? Call anyway.

Page updated

Price your Allen project

Call 469-972-8639 or send the form with a few photos and your address. Our concrete contractor in Allen will pull the plat, check the right-of-way line and send a free written estimate.

469-972-8639 Request a Free Estimate
Call NowFree Estimate